SNCF

Beyond B100: SNCF’s ‘PlaneTER’ strategy for greener rail operations

The B100 plant-based biodiesel is made from locally grown rapeseed. 2021, SNCF

Following the successful implementation of rapeseed-based biofuel B100 in Normandy, SNCF Voyageurs is also looking into Hydrotreated Vegetable Oil (HVO), batteries and hydrogen. RailTech.com sat down with Stéphane Chwalik, head of decarbonisation efforts for the Transport Express Régional (TER) fleet, to learn more about the company’s strategy. 

Want to read more?

Subscribe now!

Take advantage of our exclusive offer to get full access to all premium content.

See the offer

Author: Emma Dailey

Emma Dailey is an editor at RailTech.com and RailTech.be.

1 comment op “Beyond B100: SNCF’s ‘PlaneTER’ strategy for greener rail operations”

bönström bönström|14.02.23|10:41

For sake of quality at service rendered to client, payer, now urgently redundancy has to be ensured, at electrification – and all the way!…
(No sudden, unplanned stops are accepted – at current “On Demand” supply chains!)

Add your comment

characters remaining.

Log in through one of the following social media partners to comment.

Beyond B100: SNCF’s ‘PlaneTER’ strategy for greener rail operations | RailTech.com
SNCF

Beyond B100: SNCF’s ‘PlaneTER’ strategy for greener rail operations

The B100 plant-based biodiesel is made from locally grown rapeseed. 2021, SNCF

Following the successful implementation of rapeseed-based biofuel B100 in Normandy, SNCF Voyageurs is also looking into Hydrotreated Vegetable Oil (HVO), batteries and hydrogen. RailTech.com sat down with Stéphane Chwalik, head of decarbonisation efforts for the Transport Express Régional (TER) fleet, to learn more about the company’s strategy. 

Want to read more?

Subscribe now!

Take advantage of our exclusive offer to get full access to all premium content.

See the offer

Author: Emma Dailey

Emma Dailey is an editor at RailTech.com and RailTech.be.

1 comment op “Beyond B100: SNCF’s ‘PlaneTER’ strategy for greener rail operations”

bönström bönström|14.02.23|10:41

For sake of quality at service rendered to client, payer, now urgently redundancy has to be ensured, at electrification – and all the way!…
(No sudden, unplanned stops are accepted – at current “On Demand” supply chains!)

Add your comment

characters remaining.

Log in through one of the following social media partners to comment.