![](https://www.railtech.com/wp-content/uploads/2024/03/Zonnepanelen-op-Utrecht-Centraal-Photo-Alex-480x360.jpeg)
ProRail fails to meet CO2 emission target
ProRail reports a downgrade on the CO2 Performance Ladder from level 5 to level 4. The primary reason cited is the failure of the rail infrastructure manager to…
ProRail reports a downgrade on the CO2 Performance Ladder from level 5 to level 4. The primary reason cited is the failure of the rail infrastructure manager to…
The French railway network is 47,000 kilometres long. Until 2020, these tracks were inspected on foot by agents on average every 2 months. Since then, they have been…